Home  
Home Showroom
Home
home
Home
 
Commercial Recording Studio
Residential Recording Studio
Performance/Rehearsal Studio
Post Production
Vocal Booth
Home Theater
Restaurant
Photos
Other Broadcast/Post Production Rooms
 
Bay Films

Project Scope: Acoustic Design/Installation
Off the shelf products were installed on day’s notice to convert an office into a working production space.
A_BF_before B_BF_leftFront C_bf_leftWall D_bf_RightFront  
Before
Left Front Wall
Left Wall
Right Front Wall
 
Warner Brothers

Project Scope: Acoustic Design/Installation
1” fabric panels to help absorb early reflections and custom built gobos to absorb low frequency. A well tuned room that yields a much more comfortable work environment - Installed in six hours.
E_wb_before F_wb_frontWall
G_wb_leftWall
H_wb_goboTreatment
I_wb_backwall
Before
Front Wall
Left Wall
Gobo Treatment
Back Wall